Writing & planning

Research Gantt Chart Maker for PhD, Thesis and Project Timelines

Every research proposal needs a realistic timeline. Start from a PhD, master’s thesis or systematic review template, adjust the tasks and download a clean Gantt chart for your proposal, thesis or grant application.

100% freeNo sign-upRuns in your browser
Research Gantt Chart Maker🔒 Your data never leaves your device
TaskPhaseStartDurationMilestone

How to use the Research Gantt Chart Maker

  1. Pick a template (a 3- or 4-year PhD, master’s thesis, systematic review or grant project) or start from scratch.
  2. Edit the task names, phase, start and duration. Tick Milestone for one-off events like a proposal defence or submission.
  3. Choose the time unit and, optionally, a start month (for example 2027-10) to show real month names.
  4. Download the chart as PNG for Word or PowerPoint, SVG for editing, or CSV for Excel. Your plan is saved in your browser.

Why your proposal needs a Gantt chart

Reviewers and supervisors want to see that your project is feasible in the time and budget you have. A Gantt chart shows that at a glance: what happens when, which tasks overlap and when the key milestones fall. It is usually the last figure in the methods or work-plan section of a PhD research proposal and a required part of most grant applications.

Tips for a realistic research timeline

  • Overlap tasks. Writing and analysis should run alongside data collection, not only at the end.
  • Add buffer time. Ethics approval, equipment, field seasons and reviewers always take longer than planned. Add 10–20%.
  • Show milestones. Proposal defence, papers submitted, conference talks and thesis submission show progress.
  • Link to your objectives. Name tasks after your objectives or work packages so reviewers can match the plan to your aims.
  • Respect seasons. In agriculture and field ecology, experiments follow growing seasons, so plan around them.
Writing up your methods next? Use the sample size calculator to justify how many samples fit in your timeline, and check your proposal length with the word counter.
Writing a thesis, paper or proposal? Read the free scientific writing guide and the PhD research proposal guide, or learn to use AI tools responsibly in our course.

Frequently asked questions

What should a PhD Gantt chart include?

The main phases (literature review, proposal, data collection, analysis, writing), each objective or study as its own task, publications, conferences, training and key milestones such as the proposal defence, thesis submission and viva.

Months or weeks: which time unit should I use?

Use months for PhD and grant timelines, weeks for a short master’s thesis or internship, and quarters for multi-year projects with many work packages.

Can I edit the chart in PowerPoint?

Yes. Download the SVG and insert it into PowerPoint (Insert > Pictures). You can convert it to shapes to change colours or text. For Word, the PNG is the easiest choice.

Is my timeline saved?

Yes, automatically in your own browser on this device. It is not uploaded anywhere. Download the CSV if you want a backup or to continue in Excel.

How long does a PhD take?

In the UK and much of Europe, a full-time PhD usually takes 3–4 years. In the US it is often 5–6 years including coursework, and in Pakistan 3–5 years. Use the matching template and adjust it.

Can I use this for a grant application?

Yes. The grant template uses work packages (WP1, WP2…) and reporting milestones, the format most funders, including Horizon Europe and national research councils, expect.

More free tools

See all Codanics tools →

Made by Dr. Muhammad Aammar Tufail, Codanics. Found a bug or have an idea for a new tool? Tell us on the WhatsApp channel or in the YouTube comments. Results are for learning and planning; check important analyses with a statistician or your supervisor.